Foothills Logistics Centre Outline Plan - May 2026
The Outline Plan consists of the following lands:
Lot 2, Block 4, Plan 1213109, Ptn: NE 13-20-29-W4M
Lot 3, Block 4, Plan 1311304, Ptn: NE 13-20-29-W4M
Ptn: NE 13-20-29-W4M
Plan 9410556, Block 2, Ptn: SE 24-20-29-W4M
Adopted by Resolution 184-26 - March 4, 2026
The Foothills Logistics Outline Plan provides support for the development of approximately 142.89 acres of land, proposed as Business Park (BP), Highway Commercial (HC), Environmental Protection (EP), Municipal Land/Reserve (MLR), and Natural Resource Extraction (INR) in an approval which provides Highway Commercial development adjacent to 79th Street East with direct exposure to the Highways 2/547/7, along with internal development of a Business Park, with protection of lands with excessive slopes and lands within the floodway for the Sheep River. The Plan also provides storm pond development, reserve dedication, and allowance for continued use of the existing asphalt plant under Natural Resource Extraction District, with Site Specific Amendments provided to the height restriction and permitted uses within the Business Park District. The lots are proposed to be serviced through connection to the County’s potable water infrastructure with interim wastewater to be provided through pump out tanks, prior to expected connection to the County’s wastewater infrastructure.